Port of Québec
Water Temperature

7.7C (45.9F)

Tides

Next Tide

Rising

High

16:57

Low

00:18


Water Temperature

7.7C (45.9F)

Tides

Next Tide

Rising

High

16:57

Low

00:18


Media and public relations

Foulon walkway preliminary design is now available

06/19/2014

 The Port of Québec will complete the last 1.7 kilometres of the Promenade Samuel-De Champlain. This last section will end at the gates of Old Québec, making the Promenade a link between the river, the port and the city.

To improve the coexistence of port and city life, the QPA has planned a 1.7 km greenway that will extend between the Bassin Brown and Gilmour Hill. The residents of Cap Blanc will see a green recreational space installed in 2015 that will separate residential areas from port activities.

The preliminary concept is now available for consultation on the web site until october 17th 2014. We invite you to take a look at the projet and to send us your comments and suggestions at c[email protected]

Water Temperature

7.7C (45.9F)

Tides

Next Tide

Rising

High

16:57

Low

00:18