Port of Québec

Media and public relations

Foulon walkway preliminary design is now available

06/19/2014

 The Port of Québec will complete the last 1.7 kilometres of the Promenade Samuel-De Champlain. This last section will end at the gates of Old Québec, making the Promenade a link between the river, the port and the city.

To improve the coexistence of port and city life, the QPA has planned a 1.7 km greenway that will extend between the Bassin Brown and Gilmour Hill. The residents of Cap Blanc will see a green recreational space installed in 2015 that will separate residential areas from port activities.

The preliminary concept is now available for consultation on the web site until october 17th 2014. We invite you to take a look at the projet and to send us your comments and suggestions at communications@portquebec.ca

Last Received Data :
2018/01/19 at 14:16

Climatic Conditions
Webcam Local Hour

Québec

Tides

Descendante

Next Tide
Basse

15:15

Haute

19:57

Weather
Friday 19 January

Current temperature

-3C

Snow

MAX / -2 MIN / -8

Sunrise 07:23 AM  Sunset 04:29 PM

Saturday 20 January

Snow

MAX / 3 MIN / -4

Sunrise 07:23 AM  Sunset 04:30 PM

Wind

SW 7 km/h (4 kts)

Humidity

83%

Pressure

101.0kPa

Water Temperature

0.1C (32.1F)

CloseClose